- Publisher: Nabhi Publication
- Edition: 1 Ed 2022
- ISBN 13 9788195527540
- Approx. Pages 735 + Contents
- Format Paperback
- Approx. Product Size 21 x 14 cms
- Delivery Time Normally 7-9 working days
- Shipping Charge Extra (see Shopping Cart)
............................................................................................
Description
Incorporating
MES Manual on Contracts, 2020
Effective from 1.4.2021
alongwith
Text of Relevant Paras of MES Regulations,
Defence Works Procedure, CVC Guidelines and Other Relevant Material
The MES has issued its Manual on Contracts, 2020 and it has been enforced w.e.f. 1.4.2021. The new manual incorporates changes in consonance with the latest policy instructions and guidelines including the General Financial Rules, 2017 and CVC guidelines on the subject. The manual revised after a gap of over 8 years, is based on concepts of transparency, fairness, competition, clarity and accountability. Encouraged by the overwhelming response from our readers and their demand, we are now pleased to present this first edition of Nabhi's MES MANUAL ON CONTRACTS - PRACTICE & PROCEDURE, 2022. Incorporating the text of the manual and supported by relevant paras of MES Regulations, Defence Works Procedure, CVC Guidelines/ Circulars, and text of other relevant material, the book shall serve as a handy reference for policy instructions and guidelines pertaining to all facets of tendering, enlistment, contract administration, arbitration and other parameters connected with the subject of contract management as such. To distinguish from the main text, other relevant material has been given in smaller fort and in a box. A number of useful references and cross references have been provided which will enhance practical utility of the book.
............................................................................................
Table of Contents
Part I : Pre-Contract Stage
Section 1 : Enlistment of Contractors, Standing Security Deposit, Upgrading,
Removel and Down Grading of Contractors
Section 2 : Earnest Money Deposit, Performance Security Deposit and Bank Gurantee Bond for
Performance Security Deposit
Section 3 : E-Tendering
Section 4 : Legal Requirements, Types of Contract and Contract Forms
Section 5 : Prepartion of Tender Documents
Section 6 : Issue of Stores to Contractors for Incorporation in the Works under Schedule B
Section 7 : Issue of Tools & Plants (T&P) on Hire to Contractors under Schedule C
Section 8 : Special Conditions and Other Provisions for Inclusion in Tender Documents
Section 9 : Specifications
Section 10 : Terms Contracts and Contracts for Periodical Services
Section 11 : Procedure for Entering into Agreement for Specialist Consultancy Services
Section 12 : Contracts for Specialist works based on T & Q Bids
Section 13 : Contracts for Supply of Stores and materials
Section 14 : Contracts for Handing and/ or Conveyance of Stores and Auctioning
Section 15 : Engineering procurement and Contruction (EPC) Contracts
Part II : Contract Stage
Section 16 : Contract Administration - General principles and Specimen Letters/ Formats
Section 17 : Time for Completion of Work, Extension of Time, Compensation for Delay,
Suspension of Work
Section 18 : Interim Payment (RARs), RAR under Compensation, BGBs in Lieu of
Retention Money/performance Security, Measures to Aviod Overpayment in RARs
Section 19 : Deviation orders, DO Limit, AIP, Amendment to Contract
Section 20 : Final Bill, Measurres to Aviod Delays, Payment of Omitted items, Refund of
Recovery, Star Rate/Special Rate
Section 21 : miscellaneous Instruction like issue of water, Devaluation, Death, Revocation
of Concellation, Deduction of I.T.at Source, Fair wages , Labour Laws etc
part 3 : Post Contract Stage
Section 22 : Techical Examination Organisation Introduction, Organisation Command and Control
& Charter of Duties
Section 23 : Visits and Inspections, Technical Examination, Formulation of Observation & Interction
with Staff
Section 24 : Draft Paras (DPs) and Serious Cases (CSs)
Section 25 : Examination of MES Works/Procurement by CVC or by CVO
Section 26 : Recovery of Over Payments from Contractors
Section 27 : Measures to Reduce Arbitration Cases & Common Causes Leading to Arbitration in MES
Section 28 : proedure for Appointment of Arbitrator including Guidlines for Appointment of Arbittrator
Section 29 : Preparation and Defence of Aritration Cases
Section 30 : Actions to be Taken after Receipt of Award, Memorandum of Award, Stamp Duty
on Award, Miscellaneous Issures Pertaining to Arbitration Cases etc
Section 31 : Civil Proceedings: Court Cases
Section 32 : important Court Judgement which can be Referred in preparation and Defence
of Arbitration Cases
Part IV : Reports and Returns
Section 33 : Reports and Returns in Respect of Dte. of Contract Management/E8 Section
............................................................................................