- Author(s): Bare Act
- Edition: Current Year
- Approx. Pages 178 + Contents
- Format Paperback
- Delivery Time Normally 7-9 working days
.........................................................................................................................
Description
• The Static and Mobile Pressure Vessels (Unfired) Rules, 2016
• The Petroleum Products (Maintenance of Production, Storage and Supply) Order, 1999
• The Liquefied Petroleum Gas (Regulation of Supply and Distribution) Order, 2000
• The Liquefied Petroleum Gas (Regulation of Use in Motor Vehicles) Order, 2001
........................................................................................................................
Contents
Chapter I : Preliminary
Chapter II : General Provisions
Chapter III : Importation of Cylinders, Valves and LPG Regulators
Part 1: General
Part 2: Importation by Sea
Part 3: Importation by Land
Part 4: Importation by Air
Chapter IV : Examination and Testing of Cylinders
Chapter V : Dissolved Acetylene Gas Cylinders
Chapter VI : Filing and Possession
Chapter VII :
Chapter VIII : Accidents and Inquiries
Chapter IX : Powers
Th Static and Mobile Pressure Vessels (Unfired) Rules, 2016
Rule 1 - 72
Appendix I - III
Schedule I - IV
Section 1 - 3
Form AS-I to Form LS-2
The Petroleum Products (Maintenance of Production, Storage and Supply) Order, 1999
Para 1 - 10
The Liquefied Petroleum Gas (Regulation of Supply and Distribution) Order, 2000
Para 1 - 16
Schedule I - VII
The Liquefied Petroleum Gas (Regulation of use in Motor Vehicles) Order, 2001
Para 1 - 12
Schedule I - V
.........................................................................................................................